[1]
Olavarrieta, M.A., Rodríguez, F. and Valero, A.K. 2025. Unplanned maintenance triggered the failure mechanism in the Barquisimeto Health Sciences Dean’s office building. Gaceta Técnica. 26, 2 (Jul. 2025), 14-23. DOI:https://doi.org/10.51372/gacetatecnica262.2.